Wharf Deck Removal Project

Our team successfully completed the wire sawing of a reinforced concrete wharf deck as part of a targeted marine infrastructure project. Precision wire sawing was used to cut the concrete deck into engineered lift sections, allowing each section to be safely removed with minimal impact on the surrounding structure.


Working within an active waterfront environment required careful planning, effective coordination, and strict adherence to safety and environmental requirements. The use of wire sawing provided a controlled, low-vibration solution, making it ideal for protecting adjacent infrastructure while delivering accurate cuts.


Comprehensive slurry containment and collection systems were implemented throughout the works to prevent contamination of the surrounding waterway. All cutting operations were completed in accordance with EPA environmental guidelines, ensuring responsible management of concrete slurry and wastewater.


The project was delivered safely, efficiently, and on schedule, demonstrating our expertise in precision concrete cutting, crane-assisted removals, and environmentally responsible demolition within sensitive marine environments.

Contact form